2026 Product Catalog now availableDownload
Factory Direct · Handan, Hebei, China

Procuring Formwork Fasteners?
You're Already Talking to the Factory.

In-house CNC production of tie rods, water stop systems, cones and anchors, to DIN and ISO standards. Non-standard sizes made to your drawing.

ISO 9001 / 14001 / 45001DIN Standard SpecsIn-House CNC MachiningNon-Standard Sizes to DrawingOEM / ODM Welcome
18+
Years in Formwork Fasteners
48+
Export Countries
7-30d
Stock Lead Time
For Procurement Managers Only

Are You a Procurement Manager? Then Let's Talk Specs.

We are a B2B fastener factory, not a retailer. If you are sourcing for an engineering project, send the parameters on the right and receive an engineering-reviewed quote within 24 hours.

Buying a few pieces for a repair job?We supply project-scale orders. For retail quantities, please contact your local distributor.
What we need from youFaster quote = complete spec
01
Material Grade

Q235, 45# steel, 40Cr, stainless 304/316...

02
Strength Class

4.8, 8.8, 10.9 or your design load

03
Thread Spec

D15 / D20, thread pitch, length tolerance

04
Surface Finish

Black oxide, electro or hot-dip galvanizing

05
Quantity

Pieces, sets, or container volume

06
Drawing or Sample

PDF / DWG / DXF, or a physical sample

Send My Parameters
Material Selection Guide

Spec Right the First Time: A Fastener Material Guide

The single biggest source of order errors is a vague specification. Use this checklist when you send us your requirements.

Tie Rods & Water Stop Rods

Tie Rods & Water Stop Rods

Material
Q235 · 45# steel · 40Cr
Strength
4.8 / 8.8 / 10.9
Finish
Black oxide · Electro-galv. · Hot-dip galv.
Use
Slab, wall and retaining-wall formwork; waterproof walls with five-section rods
Climbing Cones & Sleeves

Climbing Cones & Sleeves

Material
PP / PVC + steel core
Strength
Tolerance ±0.5 mm
Finish
Matched to your system brand
Use
Climbing, slipform and single-sided formwork systems
Anchors & Embedded Parts

Anchors & Embedded Parts

Material
Q235 · 45# steel
Strength
8.8 / 10.9 available
Finish
Hot-dip galvanized, HDG thickness per spec
Use
Foundations, solar farms, precast and wind projects
Nuts, Washers & Accessories

Nuts, Washers & Accessories

Material
45# steel · Stainless 304
Strength
DIN 934 / DIN 125 classes
Finish
Per project spec
Use
Matching accessories to complete the BOM in one order
Why Orders Go Wrong

6 Order Mistakes That Cost Procurement Teams Time and Money

These are the failures we see most often in formwork fastener imports, and the controls we build into every order to stop them.

01

Tolerance drift on tie rod length

Our control: CNC cutting with 100% gauge checks; a dimensional report is sent before shipment.

02

Mixed or missing parts on site

Our control: BOM-based kit packing. Every case is marked to your drawing, so the crew matches parts in minutes.

03

Threads that do not fit on site

Our control: CNC thread rolling plus go / no-go gauge inspection on every batch.

04

Coating thickness below spec

Our control: Salt-spray tested finishes, with a batch coating report included in the shipment.

05

Lead time slipping on large orders

Our control: Raw material stock and a weekly production plan shared with key accounts.

06

Rust and damage in transit

Our control: Seaworthy export packing: pallet, steel strapping, waterproof wrap, and container loading photos.

A Fixed Process, From Spec to Shipment

8 Steps Between Your Specs and the Port

Procurement decisions get easier when every step is predictable. This is exactly how every Qianheng order runs.

01Day 0

Send Specs or Drawing

Email, WhatsApp, or the form below. PDF / DWG / DXF, or a physical sample.

02Within 24h

Engineering Review

Our engineers check dimensions, grade, thread and finish against your drawing.

03Day 1-2

Quotation

FOB / CIF / CFR / EXW pricing with payment terms (T/T, L/C).

04Day 5-10

Sampling

Pre-production samples for approval on custom items.

05Signed off

Sample Approval

You approve the sample; production starts on your confirmation.

06Stock 7-30d / Custom 20-35d

Production + QC

In-process checks, batch testing, and a dimensional report.

07Day before shipping

Export Packing

Pallet + steel strapping + waterproof wrap, marked per your BOM.

08On schedule

Shipping

Container loading photos and packing list delivered to you.

24h engineering reviewSample before mass productionBatch test reportsLoading photos provided
Frequently Asked Questions

Answers Procurement Teams Ask Before Ordering

MOQ depends on the item and specification. Stock items accept small trial orders, and mixed-SKU orders are welcome, so you can test a little of everything in one shipment.

Get Your Quote

Send Your Specifications. Get an Engineering-Reviewed Quote.

Fill in the parameters you have. If anything is missing, our engineers will ask the right questions and come back to you within 24 hours.

Trade terms at a glance

Payment
T/T · L/C at sight (large orders)
Incoterms
FOB Tianjin · CIF · CFR · EXW
Currencies
USD · EUR · RUB · TRY · AED · SAR
Lead time
Stock 7-30 days · Custom 20-35 days
Support
PDF / DWG / DXF drawings welcome
Prefer to talk directly?WhatsApp: +86 132 8318 9755

Request a quote

We reply within 24h (Mon-Sat, GMT+8). Your specs are treated as confidential.